Electrical Exterior Facilities


Electrical Exterior Facilities






Download :     pdf1



File : pdf, 3.34 MB, 201 pages



TOC



CHAPTER 1. INTRODUCTION



I-PRIMARY CONSIDERATIONS

II-SAFETY

III-AVOIDING PROBLEMS



CHAPTERS 2. INSPECTION AND TESTS



I-PERFORMANCE

II-REQUIREMENTS



CHAPTER 3. TRANSMISSION AND DISTRIBUTION SUBSTATIONS



I-GOVERNING CONSIDERATIONS

II-STRUCTURE MAINTENANCE

III-SUBSTATION YARDS

IV-INSULATORS

V-BUS STRUCTURES

VI-INSTRUMENT TRANSFORMERS

VII-BUSHINGS



CHAPTER 4. OVERHEAD DISTRIBUTION



I-ASSOCIATED OVERHEAD DISTRIBUTION GUIDANCE

II-DEFINING VOLTAGE  NOMENCLATURE

III-TYPES OF MAINTENANCE

IV-WOOD POLES

V-CROSSARMS, BRACES, AND PLATFORMS

VI-MAINTENANCE WOOD PRESERVATION

VII-METAL POLES

VIII-CONCRETE POLES

IX-OVERHEAD OPEN WIRE CONDUCTORS

X-OVERHEAD CABLE

XI-CONDUCTOR CONNECTIONS

XII-POLE-LINE INSULATORS

XIII-GUYS

XIV-TREE TRIMMING

XV-LIVE-LINE MAINTENANCE

XVI-AERIAL LIFT REQUIREMENTS

Aerial lift construction

Aerial lift specificss



CHAPTER 5. UNDERGROUND AND SUBMARINE CABLES

I-ASSOCIATED GUIDANCE

II-SAFETY PRECAUTIONS

III-INSPECTION

IV-MAINTENANCE AND REPAIR OF DUCT SYSTEMS

V-CABLE FAULTS AND FAULT LOCATIONS

VI-CABLE REPAIR

VII-CABLE TESTING

IX-UNDERGROUND CORROSION CONTROL



CHAPTER 6. OUTDOOR LIGHTING



I-LIGHTING AND CIRCUIT TYPES

II-MULTIPLE TYPE LIGHTING

III-LIGHT DISTRIBUTION

IV-SERIES TYPE AIRFIELD LIGHTING



CHAPTER 7. TRANSFORMERS AND REGULATORS



I-CONSIDERATIONS

II-MAINTENANCE



CHAPTER 8. OVERCURRENT PROTECTIVE AND SWITCHING DEVICES



I-CONSIDERATIONS

II-FUSES

III-SWITCHES

IV-CIRCUIT BREAKERS

V-MISCELLANEOUS DEVICES



CHAPTER  9. OVERVOLTAGE PROTECTION



I-CONSIDERATIONS

II-SURGE (LIGHTNING) ARRESTERS

III-OTHER DEVICES



CHAPTER  10. GROUNDING



I-CONSIDERATIONS

II-MAINTENANCE

III-TESTING



CHAPTER 11. RELAYS AND CONTROLS

I–RELAYS, ELECTRIC POWER APPARATUS

II-CONTROLS



CHAPTER 12. INSTRUMENTS AND METERS



I-CONSIDERATIONS

II-PREVENTIVE MAINTENANCE

III-CALIBRATION AND ADJUSTMENT

IV-REPAIRS

V-TROUBLESHOOTING



CHAPTER 13. POWER CAPACITORS



I-CONSIDERATIONS

II-MAINTENANCE AND INSPECTION

III-TESTS



CHAPTER  14. STORAGE BATTERIES



I-CONSIDERATIONS

II-FLOODED LEAD-ACID BATTERY MAINTENANCE

III-FLOODED LEAD-ACID BATTERY CHARGING

IV-VALVE-REGULATED LEAD-ACID CELL BATTERIES

V-Nickel-cadmium cell batteries

VI-CHECKS AND TROUBLESHOOTING

VII-BATTERY CHARGING EQUIPMENT

VIII-PLACING A NEW BATTERY IN SERVICE

IX-PUTTING A BATTERY IN STORAGE

X-REPLACEMENT AND DISPOSAL



CHAPTER  15. TOOLS AND EQUIPMENT



I-USE

II-HAZARDOUS MATERIAL PROCEDURES

III-PROTECTIVE EQUIPMENT

IV-CLIMBING EQUIPMENT

V-LIVE-LINE TOOLS

VI-HAND TOOLS

VII-ROPE

VIII-LARGE PORTABLE AND MOBILE EQUIPMENT

IX-ELECTRICAL INSPECTING AND TESTING EQUIPMENT



CHAPTER 16. ELECTRICAL SERVICE INTERFERENCE

I-DISTURBANCE PRODUCERS

II-ELECTROMAGNETIC INTERFERENCE

III-HARMONIC INTERFERENCE



CHAPTER  17. MAINTENANCE SCHEDULES

I-CONSIDERATIONS

II-SCHEDULES

0 comments:

Post a Comment

I thank you for taking time to visit my blog. I appreciate your comment which motivates me and also helps me improve the contents on my Blog.
Your comments also make these posts much more interesting to read. Please do continue to leave your views and if you have any queries regarding my recipes I would do my best to reply to them ASAP.

Cheers
Analog Designer

Related Posts

  © Blogger templates by Template-Service

Back to TOP