Steam Power Plants


Steam Power Plants



Download: pdf1



File : pdf, 1.38 MB, 313 pages



TOC



Section 1 INTRODUCTION

1.1 Scope

1.2 Cancellation

1.3 Policy



Section 2 BASIC DATA

2.1 Economic Analysis

2.2 Economic Studies

2.3 Source of Power

2.4 Private Versus Government Ownership

2.5 Expansion, Rehabilitation, and Replacement of Existing Plants

2.6 Fuel Selection

2.7 Codes and Regulations

2.8 Plant Location Factors

2.9 Types of Power Plants



Section 3 ADMINISTRATIVE PROCEDURE TO DEVELOP A POWER PLANT

3.1 Power Plant Loads

3.2 Steam Power Plant Design

3.3 Plant Design Factors



Section 4 POWER PLANT STEAM GENERATION

4.1 Steam Generators (Boilers)

4.2 Steam Pressures and Temperatures

4.3 Natural Gas Firing

4.4 Fuel Oil Firing

4.5 Coal Firing

4.6 Wood Firing

4.7 Soot Blowers

4.8 Economizers

4.9 Air Heaters

4.10 Forced Draft Fans

4.11 Induced Draft Fans

4.12 Primary Air Fans

4.13 Overfire Air Fans

4.14 Cinder Return Fans

4.15 Stacks

4.16 Blowdown Equipment

4.17 Essential Plant Equipment

4.18 Equipment Selection



Section 5 STEAM TURBINE DESIGN

5.1 Typical Plants and Cycles

5.2 Cogeneration in Steam Power Plants

5.3 Turbine Types

5.4 Turbine Generator Sizes

5.5 Turbine Throttle Pressure and Temperature

5.6 Turbine Exhaust Pressure

5.7 Lubricating Oil Systems

5.8 Generator Types

5.9 Generator Cooling

5.10 Turbine Generator Control

5.11 Turning Gear

5.12 Turbine Generator Foundations

5.13 Auxiliary Equipment

5.14 Installation

5.15 Cleanup, Startup, and Testing

5.16 Operation



Section 6 GENERATOR AND ELECTRICAL FACILITIES DESIGN

6.1 Typical Voltage Ratings and Systems

6.2 Generators

6.3 Generator Leads and Switchyard



Section 7 STEAM CONDENSERS

7.1 Condenser Types

7.2 Condenser Sizes

7.3 Condenser Materials

7.4 Condenser Support

7.5 Condenser Air Removal



Section 8 AUXILIARY EQUIPMENT

8.1 Condensate Storage and Transfer

8.2 Feedwater Heaters

8.3 Heater Drain Pumps

8.4 Deaerators

8.5 Boiler Feed Pumps

8.6 Pressure Reducing and Desuperheating Stations

8.7 Compressed Air System

8.8 Auxiliary Cooling Water System



Section 9 COAL HANDLING

9.1 Unloading Systems

9.2 Coal Crushing

9.3 Coal Storage

9.4 Coal Reclaiming

9.5 Plant Bunker or Silo Storage

9.6 Bunker or Silo Filling Systems

9.7 Coal Scales

9.8 Magnetic Separators

9.9 Coal Sampling



Section 10 ASH HANDLING

10.1 Ash Handling Systems

10.2 Bottom Ash Hoppers

10.3 Clinker Crushers

10.4 Ash Storage



Section 11 CONTROL AND INSTRUMENTATION

11.1 Types of Controls and Control Systems

11.2 Steam Power Plant Controls

11.3 Safety Devices and Interlocks

11.4 Control Loops

11.5 Flow meters

11.6 Pressure Gauges

11.7 Temperature Sensors

11.8 Transmitters

11.9 Recorders

11.10 Controllers

11.11 Operators

11.12 Positioners

11.13 Control Room



Section 12 WATER SUPPLY, MAKEUP, AND TREATMENT

12.1 Water Supply

12.2 Water Makeup

12.3 Water Treatment

12.4 Cooling Water Systems

12.5 Intake Structures

12.6 Outfall Structures

12.7 Cooling Towers

12.8 Cooling Water System Chemical Treatment



Section 13 CORROSION PROTECTION

13.1 Justification

13.2 Causes

13.3 Corrosion Controls



Section 14 SAFETY PROTECTION

14.1 Personnel

14.2 Piping and Equipment

14.3 Air Navigation

14.4 Security



Section 15 FIRE PROTECTION

15.1 General Requirements

15.2 Fuel

15.3 Transformers

15.4 Lubricating and Hydrogen Seal Oil Equipment

15.5 Standpipe and Fire Hose Stations

15.6 Portable Hand-Held Extinguishers

15.7 Typical Fire Protection Systems for Power Plants



Section 16 MISCELLANEOUS

16.1 Piping

16.2 Insulation, Lagging, and Jacketing

16.3 Freeze Protection

16.4 Pipe Supports

16.5 Heating, Ventilating, and Air Conditioning

16.6 Cranes and Hoists

16.7 Metering

16.8 Drainage

16.9 Seismic Design Criteria

16.10 Architectural Criteria

16.11 Structural Criteria

16.12 Electrical Criteria

16.13 Operation and Maintenance Manuals



Section 17 POLLUTION CONTROL

17.1 Air Quality Control

17.2 Water Quality Control

17.3 Oil Spill Control

17.4 Solid Waste Disposal



Section 18 ENVIRONMENTAL REGULATIONS AND PERMITTING

18.1 Air Quality Regulations

18.2 Water Quality Regulations

18.3 Solid Waste Disposal

18.4 Dredge and Fill Regulations

18.5 Permits



Section 19 TESTING

19.1 Equipment Testing

19.2 Preparations for Tests

19.3 Test Equipment and Materials



Section 20 LOAD SHEDDING

20.1 Objectives of Load Shedding Program

20.2 Requirements for Load Reduction

20.3 Methods of Load Shedding

20.4 Electrical Usage and Critcality



Section 21 POWER PLANT COGENERATION

21.1 Definition

21.2 Cycles

21.3 Efficiency

21.4 Methods of Operation

21.5 Interconnection with Utility

21.6 Economics




0 comments:

Post a Comment

I thank you for taking time to visit my blog. I appreciate your comment which motivates me and also helps me improve the contents on my Blog.
Your comments also make these posts much more interesting to read. Please do continue to leave your views and if you have any queries regarding my recipes I would do my best to reply to them ASAP.

Cheers
Analog Designer

Related Posts

  © Blogger templates by Template-Service

Back to TOP